FFYs 2027-31 TIP Program as of March 19, 2026

 

Project ID Proponent(s) Project Name Initial TIP Year & TIP FFYs 2026–30 Programmed Year(s) FFYs 2027–31
Programmed
Year(s)
Years Delayed Status Needed to Achieve by April Design Status /
Date Last Update
Design Status (Shorthand) Last Update Date Years Since Last PINFO Milestone Risk Risk Explanation Latest Cost Estimate (Unadjusted) FFYs 2026-30 Programmed Amount FFY 2027 FFY 2027 (New) FFY 2028 FFY 2028 (New) FFY 2029 FFY 2029
(New)
FFY 2030 FFY 2030 (New) FFY 2031 (New) Other Non-Target Funds
609204 Belmont BELMONT- COMMUNITY PATH, BELMONT COMPONENT OF THE MCRT (PHASE I) 2026
(FFYs 2023–27)
2026 2026-2027 0 - 100% Comments to DE (1/15/2026) 1 1/15/26 0.22 High Cost, 9/25/26 ad date $48,934,961 $27,306,266 $0 $18,934,961 $0 $0 $0 $0 $0 $0 $0 $0
S13295 Cambridge CAMBRIDGE- NEW BRIDGE AND SHARED-USE PATH CONSTRUCTION OVER FITCHBURG LINE AT DANEHY PARK [DESIGN ONLY] 2025
(FFYs 2025–29)
Earmark Discretionary
2026-27 2026-27 0 - PRC-Approved (5/31/2024) PRC 5/31/24 1.85 Medium NEPA required for FFY 2026 obligation $2,500,000 $2,500,000 $0 $500,000 $0 $0 $0 $0 $0 $0 $0 $0
S12970 CATA CATA - VEHICLE REPLACEMENT (7 VEHICLES), INCLUDING TRANSIT PROJECT ID RTD0010591 2025-26
(FFYs 2025–29)
2025-26 2025-26 0 - N/A N/A N/A N/A -   $2,460,000 $2,460,000 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
S12963 Chelsea, Revere CHELSEA-REVERE- REGIONAL ON DEMAND MICROTRANSIT PILOT PROJECT 2025
(FFYs 2025–29)
2025-27 2025-27 0 - N/A N/A N/A N/A -   $1,413,734 $1,413,734 $463,807 $463,807 $0 $0 $0 $0 $0 $0 $0 $0
S13388 CATA CATA- ACCESS FOR ALL 2026
(FFYs 2026–30 AM3)
N/A 2026-27 N/A N/A N/A N/A 1/7/26 0.24   Funds through SFY 2029 $690,517 $0 $0 $492,229 $0 $0 $0 $0 $0 $0 $0 $0
S13389 CATA CATA- CAPE ANN DIALYSIS TRANSPORTATION 2026
(FFYs 2026–30 AM3)
N/A 2026-27 N/A N/A N/A N/A 1/7/26 0.24   Funds through SFY 2029  $749,850 $0 $0 $508,446 $0 $0 $0 $0 $0 $0 $0 $0
S13152 MBTA MBTA- BETTER BUS PROJECT - OPERATIONAL SAFETY IMPROVEMENTS AT BUS STOPS 2026
(FFYs 2026–30)
2026 2026-27 0   N/A N/A N/A N/A   Seeking additional funding, scope $6,416,897 $3,216,897 $0 $3,200,000 $0 $0 $0 $0 $0 $0 $0 $0
S13292 MBTA MBTA - OPERATIONAL ENHANCEMENT OF BUS ROUTES 714 AND 716 2026-27
(FFYs 2026–30)
2026 2026-27 0   N/A N/A N/A N/A   Seeking additional funding $3,450,000 $1,875,000 $0 $1,575,000 $0 $0 $0 $0 $0 $0 $0 $0
606453 Boston BOSTON- IMPROVEMENTS ON BOYLSTON STREET, FROM INTERSECTION OF BROOKLINE AVENUE AND PARK DRIVE TO IPSWICH STREET 2019
(FFYs 2016–20)
2026 2031 5 - 25% Received - Resubmission 1 (1/29/2021) 25% 1/29/21 5.19 Low   $8,331,781 $9,893,018 $0 $0 $0 $0 $0 $0 $0 $0 $10,185,935 $0
605168 Hingham HINGHAM- IMPROVEMENTS ON ROUTE 3A FROM OTIS STREET/COLE ROAD  INCLUDING SUMMER STREET AND ROTARY; ROCKLAND STREET TO GEORGE WASHINGTON BOULEVARD 2024
(FFYs 2020–24)
2026-27 2027 1 - 100% Received (12/29/2025) 100% 12/29/25 0.27 Low   $32,677,057 $31,949,531 $10,000,000 $35,385,132 $0 $0 $0 $0 $0 $0 $0 $0
608067 MassDOT WOBURN- INTERSECTION RECONSTRUCTION AT ROUTE 3 (CAMBRIDGE ROAD) AND BEDFORD ROAD AND SOUTH BEDFORD STREET 2025
(FFYs 2021–25)
2026 2027 1 100% Submitted 75% Received - Resubmission 1 (11/17/2025) 75% 11/17/25 0.38 Medium Needs 100% by April $6,168,161 $4,883,749 $0 $6,168,161 $0 $0 $0 $0 $0 $0 $0 $0
610823 Quincy QUINCY- INTERSECTION IMPROVEMENTS AT WILLARD STREET AND RICCIUTI DRIVE 2026
(FFYs 2025–29)
2027 2027 0 - 100% Received - Resubmission 1 (9/9/2025) 100% 9/9/25 0.57 Low   $3,414,366 $3,700,546 $3,700,546 $3,466,129 $0 $0 $0 $0 $0 $0 $0 $0
609437 Salem SALEM- PEABODY- BOSTON STREET IMPROVEMENTS 2026
(FFYs 2023–27)
2027 2027-28 0 100% Submitted 100% Submitted
(2/27/2026)
100% 2/27/26 0.10 Low Second cost increase at 100% design $30,942,025 $25,155,213 $25,155,213 $30,942,025 $0 $0 $0 $0 $0 $0 $0 $0
612989 Boston BOSTON- BRIDGE PRESERVATION, B-16-066 (38D), CAMBRIDGE STREET OVER MBTA 2026
(FFYs 2024–28)
2027 2028 1 25% Comments 25% Received (10/14/2025) 25% 10/14/25 0.48 Very Low MassDOT suggest FFY 2028 readiness based on scope of project $20,741,786 $16,531,736 $16,531,736 $0 $0 $21,571,457 $0 $0 $0 $0 $0 $0
609257 Everett EVERETT- RECONSTRUCTION OF BEACHAM STREET 2024
(FFYs 2020–24)
2027 2030 3 - 25% Comments to DE (5/8/2024) 25% 5/8/24 1.91 Medium Utility issues need resolution. DPH not scheduled. $11,610,600 $11,410,198 $12,075,024 $0 $0 $0 $0 $0 $0 $13,003,872 $0 $0
605857 MassDOT NORWOOD- INTERSECTION IMPROVEMENTS AT ROUTE 1 AND UNIVERSITY AVENUE/EVERETT STREET  2021
(FFYs 2017–21)
2027 2029 2 DPH 25% Received - Resubmission 1 (1/5/2021)
[DPH scheduled for 03/26/2026]
25% 1/5/21 5.25 Medium Five years since last Project Info milestone, high cost risk. $26,573,400 $27,391,665 $27,636,336 $0 $0 $0 $0 $28,699,272 $0 $0 $0 $0
607981 MassDOT SOMERVILLE- MCGRATH BOULEVARD CONSTRUCTION 2027
(FFYs 2023–27)
2027-31 2028-29 1 75% Comments 25% DPH
(12/9/2025)
DPH 12/9/25 0.32 High Discretionary funding must obligate in FFY 2027 $123,447,666 $128,151,951 $30,000,000 $0 $33,075,573 $73,075,573 $30,310,000 $55,310,000 $35,000,000 $0 $0 $30,000,000
605743 Ipswich IPSWICH- RESURFACING AND RELATED WORK ON CENTRAL AND SOUTH MAIN STREETS 2023
(FFYs 2019–23)
2027-28 2050 23 - 25% Received (7/12/2024) 25% 7/12/24 1.73 -   $14,456,975 $0 $6,000,000 $0 $9,035,254 $0 $0 $0 $0 $0 $0 $0
608045 MassDOT MILFORD- REHABILITATION ON ROUTE 16, FROM ROUTE 109 TO BEAVER STREET 2024
(FFYs 2020–24)
2027 2050 23 - 25% Received - Resubmission 2 (10/13/2023) 25% 10/13/23 2.48 -   $13,027,466 $13,548,565 $13,548,565 $0 $0 $0 $0 $0 $0 $0 $0 $0
S13386 Brookline BROOKLINE- BLUEBIKES EXPANSION, 5 STATIONS 2027
(FFYs 2027–31)
N/A 2027 N/A N/A N/A N/A 1/2/26 0.26     $190,354 $0 $0 $190,354 $0 $0 $0 $0 $0 $0 $0 $0
S13412 CATA CATA- MAGNOLIA SHUTTLE 2027
(FFYs 2027–31)
N/A 2027 N/A N/A N/A N/A 1/7/26 0.24     $193,208 $0 $0 $193,208 $0 $0 $0 $0 $0 $0 $0 $0
S13409 MAPC MAPC- BOSTON, BROOKLINE, CAMBRIDGE, AND SOMERVILLE BLUEBIKES REPLACEMENT OF 60 STATIONS 2027
(FFYs 2027–31)
N/A 2027 N/A N/A N/A N/A 12/18/25 0.30     $2,500,141 $0 $0 $2,500,141 $0 $0 $0 $0 $0 $0 $0 $0
S13406 Revere REVERE- REVERE BEACH CONNECTOR (DESIGN ONLY) 2027
(FFYs 2027–31)
N/A 2027 N/A N/A N/A N/A 1/2/26 0.26     $400,000 $0 $0 $400,000 $0 $0 $0 $0 $0 $0 $0 $0
S13410 Quincy QUINCY- BLUEBIKES EXPANSION, 10 STATIONS 2027
(FFYs 2027–31)
N/A 2027 N/A N/A N/A N/A 1/2/26 0.26     $434,500 $0 $0 $434,500 $0 $0 $0 $0 $0 $0 $0 $0
610932 Brookline BROOKLINE- REHABILITATION OF WASHINGTON STREET 2027
(FFYs 2023–27)
2028 2030 2 - 25% Comments to DE
(1/27/2026)
25% 1/27/26 0.19 Medium Cost increase $34,835,146 $27,959,721 $0 $0 $15,040,279 $0 $12,919,442 $0 $0 $39,015,364 $0 $0
609252 Lynn LYNN- REHABILITATION OF ESSEX STREET 2024
(FFYs 2020–24)
2028 2030 2 25% Comments 25% Received (03/31/2025) 25% 3/31/25 1.02 Medium Significant cost increase $30,190,303 $23,567,554 $0 $0 $13,567,554 $0 $10,000,000 $0 $0 $33,813,139 $0 $0
610545 Wakefield WAKEFIELD- MAIN STREET RECONSTRUCTION 2028
(FFYs 2024–28)
2028 2031 3 - Pre-25% Submitted Pre-25% 9/24/25 0.53 Low   $26,382,000 $28,492,560 $0 $0 $28,492,560 $0 $0 $0 $0 $0 $30,603,120 $0
608954 Weston WESTON- RECONSTRUCTION ON ROUTE 30 2026
(FFYs 2023–27)
2028 2029 1 - 25% Design Public Hearing (9/22/2022) DPH 9/22/22 3.54 Medium Awaiting revised 25% $18,518,252 $19,999,712 $0 $0 $19,999,712 $0 $0 $19,999,712 $0 $0 $0 $0
608158 Westwood WESTWOOD- NORWOOD- RECONSTRUCTION OF CANTON STREET TO UNIVERSITY DRIVE 2028
(FFYs 2024–28)
2028-29 2029 1 - 25% Design Public Hearing (9/28/2023)

PRC Resubmitted (12/15/2025)
25% 12/15/25 0.31 Medium PRC was recently resubmitted $20,406,113 $22,038,602 $0 $0 $12,038,602 $0 $10,000,000 $22,038,602 $0 $0 $0 $0
608436 Ashland ASHLAND- REHABILITATION AND RAIL CROSSING IMPROVEMENTS ON CHERRY STREET 2024
(FFYs 2020–24)
2028 2050 22 - 25% Comments to DE (8/19/2020) 25% 8/19/20 5.63 -   $1,175,303 $1,269,327 $0 $0 $1,269,327 $0 $0 $0 $0 $0 $0 $0
610691 Natick NATICK- COCHITUATE RAIL TRAIL EXTENSION (MBTA STATION TO MECHANIC STREET) - NATICK CENTER CONNECTION 2028
(FFYs 2024–28)
2028 2050 22 - 25% Received - Resubmission 1
(9/4/2024)
[Requires New Submission]
25% 9/4/24 1.59 -   $10,264,573 $11,085,739 $0 $0 $11,085,739 $0 $0 $0 $0 $0 $0 $11,496,322
613319 Sudbury SUDBURY-FRAMINGHAM- BIKE PATH CONSTRUCTION OF BRUCE FREEMAN RAIL TRAIL, FROM THE SUDBURY DIAMOND RAILROAD CROSSING TO EATON ROAD WEST 2029
(FFYs 2025–29)
2029 2029 0 - 75% Received
(2/25/2026)
75% 2/25/26 0.11 Very Low Project submitted 75% in late February. Originally programmed in FFY 2029 for 25% DPH. $6,583,672 $8,628,506 $0 $0 $0 $0 $8,628,506 $7,110,366 $0 $0 $0 $0
610666 Swampscott SWAMPSCOTT- RAIL TRAIL CONSTRUCTION 2027
(FFYs 2023–27)
2029 2029 0 - PRC Approved (12/19/2019) PRC 12/19/19 6.30 Very High Not at minimum design $7,700,000 $8,624,000 $0 $0 $0 $0 $8,624,000 $8,316,000 $0 $0 $0 $8,624,000
612963 Bellingham BELLINGHAM- ROADWAY REHABILITATION OF ROUTE 126 (HARTFORD ROAD), FROM 800 FEET NORTH OF THE I-495 NB OFF RAMP TO MEDWAY TOWN LINE, INCLUDING B-06-017 2029
(FFYs 2025–29)
2029-30 2031 2 - Pre-25% Submitted Pre-25% 6/24/24 1.78 Low   $14,150,000 $15,848,000 $0 $0 $0 $0 $8,340,000 $0 $7,508,000 $0 $16,414,000 $0
606226 Boston BOSTON- RECONSTRUCTION OF RUTHERFORD AVENUE, FROM CITY SQUARE TO SULLIVAN SQUARE 2020
(FFYs 2016–20)
2029-33 2031-35 2 - 25% Received - Resubmission 1 (10/5/2020) 25% 10/5/20 5.50 Low   $175,744,200 $57,000,000 $0 $0 $0 $0 $33,500,000 $0 $33,500,000 $0 $45,000,000 $0
609246 Lynn LYNN- REHABILITATION OF WESTERN AVENUE (ROUTE 107) 2027
(FFYs 2023–27)
2029-32 2030-32 1 - 25% Comments to DE
(12/2/2025)
25% 12/2/25 0.34 Medium Significant cost increase $60,883,529 $25,000,000 $0 $0 $0 $0 $10,000,000 $0 $15,000,000 $20,000,000 $25,000,000 $0
613088 Malden MALDEN- SPOT POND BROOK GREENWAY 2027
(FFYs 2024–28)
2029 2030 1 - 25% Received
(8/25/2025)

PRC Resubmitted
(12/16/2025)
25% 12/16/25 0.30 Medium PRC was recently resubmitted $7,128,414 $4,858,127 $0 $0 $0 $0 $4,858,127 $0 $0 $7,983,824 $0 $0
610662 Woburn WOBURN- ROADWAY AND INTERSECTION IMPROVEMENTS AT WOBURN COMMON, ROUTE 38 (MAIN STREET), WINN STREET, PLEASANT STREET, AND MONTVALE AVENUE 2025
(FFYs 2021–25)
2029 2031 2 - Pre-25% Submitted Pre-25% 12/19/19 6.30 Low   $16,095,000 $18,026,400 $0 $0 $0 $0 $9,335,200 $0 $8,691,200 $0 $18,670,200 $0
612738 Ipswich IPSWICH- ARGILLA ROAD ROADWAY RECONSTRUCTION 2029
(FFYs 2025–29)
2029-30 2050 21 - PRC Approved (5/12/2022) PRC 5/12/22 3.90 -   $4,628,419 $5,183,829 $0 $0 $0 $0 $5,183,829 $0 $0 $0 $0 $5,183,829
611983 Chelsea CHELSEA- PARK STREET AND PEARL STREET RECONSTRUCTION 2027
(FFYs 2023–27)
2030 2030 0 25% Comments 25% Received
(4/17/2025)
25% 4/17/25 0.97 Medium No DPH scheduled $9,678,550 $12,123,769 $0 $0 $0 $0 $0 $0 $12,123,769 $10,839,976 $0 $0
612534 Melrose MELROSE- LEBANON STREET IMPROVEMENT PROJECT (LYNDE STREET TO MALDEN CITY LINE) 2030
(FFYs 2026–30)
2030 2030 0 25% Comments 25% Received (1/30/2025) 25% 1/10/25 1.24 Medium No DPH scheduled $3,731,526 $10,528,000 $0 $0 $0 $0 $0 $0 $10,528,000 $10,528,000 $0 $0
S13145 CTPS PROJECT DESIGN SET-ASIDE N/A 2027-30 2028-31 1   Administrative N/A N/A N/A     $0 $0 $2,000,000 $0 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $0
S12820 CTPS BIKESHARE STATE OF GOOD REPAIR SET-ASIDE N/A 2027-30 2028-31 1   Administrative N/A N/A N/A     $0 $0 $2,000,000 $0 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0
S12124 CTPS COMMUNITY CONNECTIONS PROGRAM N/A 2027-30 2028-31 1   Administrative N/A N/A N/A     $0 $0 $2,036,193 $0 $2,000,000 $2,000,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 $1,000,000 $0
S12113 CTPS TRANSIT TRANSFORMATION PROGRAM N/A 2028-30 2028-31 0   Administrative N/A N/A N/A     $0 $0 $0 $0 $6,000,000 $6,000,000 $6,500,000 $6,500,000 $7,000,000 $7,000,000 $7,000,000 $0

 

 

 

Federal Fiscal Year 2027 2027 (New) 2028 2028 (New) 2029 2029 (New) 2030 2030 (New) 2031 (New) 2027-31 Total
Total Available Regional Highway Target Funds (FFYs 2027-31 TIP): $152,627,429 $153,053,705 $158,700,879 $155,424,629 $157,518,346 $157,842,971 $160,037,411 $155,744,426 $159,173,521 $785,532,237
                               
Draft Total Programmed Regional Highway Target Funds: $151,147,420 $105,354,093 $156,604,600 $107,647,030 $165,699,104 $155,473,952 $136,850,969 $149,684,175 $158,873,255 $664,199,299
Regional Highway Target Funds Remaining (Unprogrammed): $1,480,009 $47,699,612 $2,096,279 $47,777,599 -$8,180,758 $2,369,019 $23,186,442 $6,060,251 $300,266 $121,332,938
Percent Unprogrammed 1.0% 31.2% 1.3% 30.7% -5.2% 1.5% 14.5% 3.9% 0.2% 15.4%
Total Current Projects (All) 13 8 13 7 16 8 11 2 N/A 59
Total Current Projects (Capital Construction, non-transit)   8   7   8   2 N/A 34
Number of Projects Delayed Out of Year 0 7 0 7 0 7 0 0 N/A 25
Percent of Projects Delayed Out of Year 15 87.5%   100.0%   87.5%   0.0% N/A 73.53%

 

 

Red, bolded text on cost figures indicate a change in project funding, either an increase in cost and/or a delayed start year.
Red, bolded, and italicized text on cost figures indicates that the project cost has increased beyond a threshold of $2.5 million or, for projects less than $10 million in cost, 25%. These costs are not automatically incorporated into the Readiness Scenario, and the latest cost estimate can be found in Column O.
Red cell highlighting indicates a project was recommended to move out to a later TIP year.
Blue cell highlighting indicates a project is proposed to be added to the TIP, or an existing project is seeking additional funding for an expanded scope of work.
Grey cell highlighting indicates a project is proposed to be removed from the TIP.

 

 

 

Abbreviations:

AM3 = Amendment Three to the Federal Fiscal Years 2026–30 TIP. AM10 = Amendment Ten to the Federal Fiscal Years 2026–30 TIP. CATA = Cape Ann Transportation Authority. CTPS = Central Transportation Planning Staff. DE = District Engineer. DPH = Design Public Hearing. FFY = federal fiscal year. MAPC = Metropolitan Area Planning Council. MassDOT = Massachusetts Department of Transportation. MBTA = Massachusetts Bay Transportation Authority. MCRT = Massachusetts Central Rail Trail. MPO = Metropolitan Planning Organization. MWRTA = MetroWest Regional Transit Authority. N/A = not applicable. NB = northbound. NEPA = National Environmental Policy Act. PINFO = MassDOT Project Info. PRC = MassDOT's Project Review Committee. SFY = State Fiscal Year. TIP = Transportation Improvement Program.