Memorandum

Date     January 24, 2014

To          Efi Pagitsas, Traffic Analysis and Design Group Manager, MPO Staff

From    Beth Isler, Bicycle/Pedestrian Coordinator and Livability Program Manager, MPO Staff

Re          2013 Bicycle and Pedestrian Data Collection

This memorandum summarizes the results of the 2013 bicycle and pedestrian count program.

1         Introduction

The Boston Region Metropolitan Planning Organization (MPO) collects data about the number of people who are biking and walking at locations throughout the region. The data are used to evaluate long-term volume trends, estimate bicycle and pedestrian demand, and assess changes in usage before and after projects are implemented. This information helps transportation planners and government officials make decisions for bicycle and pedestrian programs and projects, including project prioritization and funding allocation. It also helps to justify investment in bicycle and pedestrian facilities as an integral component of the region’s transportation network.

Although the MPO organizes counts only for the Boston region, it serves as a repository for counts gathered from throughout the state. Counts are generally collected by volunteers, municipalities, and other organizations and typically occur during the months of May, July, and September. The data are publicly available in the online Bicycle/Pedestrian Count Database, which can be accessed from the MPO’s website at www.bostonmpo.org.

2         Methodology

This section describes how the count data is currently collected in the Boston region. Data are gathered for both off- and on-street users. Off-street counts record walkers and bicyclists on trails or shared-use paths. On-street counts collect the numbers of

Data were collected in May, July and September of 2013 according to the recommendations of the National Bicycle and Pedestrian Documentation Project (NBPD), an Institute of Transportation Engineers (ITE)-sanctioned program.

3         Results

In 2013, 47 counts were conducted at 20 locations around the state, as shown in Table 1.

Table 1

Locations Counted in 2013

Municipality

Count Location Description

1

 Bedford

Minuteman Trail - Between South Road and Wiggins Ave

2

 Cambridge

Minuteman Trail - North of Route 2 / Alewife Station

3

 Lexington

Minuteman Trail - Lexington Depot / East of Hancock St / Meriam St / Station Way

4

 Hudson

Assabet River Trail - Rte 85 Crossing

5

 Boston

Southwest Corridor Trail - 100 ft North of Heath St

6

 Cambridge

Kendall Square - Broadway / Main St / 3rd St

7

 Southwick

Congamond Rd and Rte 168 Crossing

8

 Arlington

Minuteman Trail and Swan Place

9

 Salisbury

Old Eastern Marsh Trail and Friedenfels Street

10

 Newburyport

Clipper City Rail Trail at Washington Street

11

 Bedford

Great Rd at South Rd

12

 Bedford

Shawsheen Rd at Page Rd

13

 Bedford

Concord Rd at Mcmahon Rd

14

 Methuen

Methuen Rail Trail at Railroad St Parking Lot

15

 Needham

Kendrick St. and Hunting Rd

16

 Westfield/ Southwick

Columbia Greenway Rail Trail at Southwick Border

17

 Amesbury

Amesbury Riverwalk/Powwow Walk

18

 Quincy

Hancock Street at Washington Street

19

 Quincy

Neponset Bridge at Quincy Shore Drive

20

 Quincy

Wollaston Beach at 790 Quincy Shore Drive

 

Of these locations, 14 are within the Boston MPO region and the remaining six are outside of the region. Eight locations are on-street while the rest are trails or shared-use paths.

The hour during which the highest volumes were observed was determined for each location; these volumes are shown in Figure 1. For the majority of weekend counts, the highest hour volumes occurred during midday (consistent with the NBPD project guidelines); during the weekday counts the highest hour volumes occurred during the afternoon (PM). Historical data and analysis of each of location counted in 2013 is provided in Appendix (attached).

Figure 1

2013 Volumes during Hour of Highest Observed Usage

Figure 1 is a graph that shows the hours during which the highest volumes were observed for each count location.

As shown, the Minuteman Bikeway has the highest volumes of all the locations counted in 2013. However, the greatest number of all-day counts took place at locations along the Minuteman Bikeway, ensuring that the peak hour was captured. Other locations that were only counted for a couple hours may not have been recording peak usage.

Of the 11 day-long counts, nine took place on the weekend and all were on trails. The weekend data are shown in Figure 2, and the weekday data are show in Figure 3. The weekend trail data likely reflect recreational rather than commuter use.

In Figure 2, there is no obvious reason for the unique data line shown for the Minuteman Bikeway at Lexington Depot on the Sunday in May. The most likely reason would be a change in weather, although without more data there is no way of knowing.

 

Figure 2

2013 Weekend Day-Long Count Results

Figure 2 is a graph that depicts results of the nine counts that took place on the weekend, and all were on trails.

Figure 3

2013 Weekday Day-Long Count Results

Figure 3 is a graph that depicts results of the TWO counts that took place on weekdays.

 

6         Conclusion

The MPO plans to continue collecting bicycle and pedestrian data in 2014. Developing a more robust data-collection program is essential in order to help inform bicycling and walking planning and project prioritization.

 

BI/bi

 

 

Attachments  

APPENDIX. Count Data

 

APPENDIX. COUNT DATA

A.1      Bedford: Minuteman Trail — Between South rd AND Wiggins Ave

TABLE 1

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
September 2007  Sa 4:30-5:30 PM 121
May 2008  Sa 9:45-10:45 AM 96
May 2008  Tu 12:15-1:15 MID 292
July 2008  Sa 9:45-10:45 AM 289
September 2008  Sa 3:00-4:00 PM 286
May 2009  W 11:45-12:45 MID 198
May 2009  Sa 12:15-1:15 MID 314
September 2009  Su 2:30-3:30 MID 399
September 2009  Tu 12:00-1:00 MID 187
July 2010  Sa 10:00-11:00 AM 336
July 2010  Tu 12:00-1:00 MID 131
September 2010  Tu 12:00-1:00 MID 144
May 2011  Sa 11:15-12:15 MID 253
May 2011  Tu 7:30-8:30 AM 34
July 2013  Sa 9:15-10:15 AM 210

 

FIGURE 1

12-Hour Counts

Figure 1 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data


FIGURE 2

Weekday Peak Hour Volumes

Figure 2 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 3

Weekend Peak Hour Volumes

Figure 3 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

A.2      Cambridge: Minuteman Trail — north of route 2/alewife station

TABLE 2

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
May 2008  Tu 5:30-6:30 PM 664
May 2008  Sa 10:15-11:15 MID 221
July 2008  Sa 10:00-11:00 MID 230
May 2009  Sa 3:15-4:15 PM 241
July 2009  W 5:30-6:30 PM 465
July 2009  Sa 10:30-11:30 MID 312
May 2013  Tu 7:45-8:45 AM 676

 

FIGURE 4

12-Hour Counts

Figure 4 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data.


 

FIGURE 5

Weekday Peak Hour Volumes

Figure 5 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 6

Weekend Peak Hour Volumes

Figure 6 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.


A.3      Lexington: MINUTEMAN TRAIL — LEXINGTON DEPOT/EAST OF HANCOCK ST/MERIAM ST/STATION WAY

TABLE 3

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
September 1993  Tu 5:15-6:15 PM 124
May 1994  M 2:00-3:00 MID 678
July 1998  Sa 1:45-2:45 MID 431
July 1998  Su 2:00-3:00 MID 648
September 2007  Sa 9:30-10:30 AM 311
May 2008  Sa 9:15-10:15 AM 153
May 2008  Tu 6:00-7:00 PM 275
May 2008  Sa 3:30-4:30 PM 408
July 2008  Sa 9:15-10:15 AM 348
July 2008  Tu 5:30-6:30 PM 334
September 2008  Sa 2:00-3:00 MID 349
May 2009  Sa 2:45-3:45 MID 338
May 2009  Tu 5:30-6:30 PM 275
September 2009  Sa 3:00-4:00 PM 397
September 2009  Tu 5:30-6:30 PM 223
May 2010  Sa 1:30-2:30 MID 495
May 2010  Tu 9:15-10:15 AM 150
September 2010  Sa 3:30-4:30 PM 462
May 2012  Sa 2:45-3:45 MID 588
September 2011  Sa 2:45-3:45 MID 487
September 2011  Tu 5:30-6:30 PM 294
September 2012  Th 5:45-6:45 PM 232
September 2012  Sa 3:00-4:00 PM 462
May 2012  Tu 12:15-1:15 MID 122
May 2013  Tu 6:00-7:00 PM 333
May 2013  Su 4:00-5:00 PM 557
September 2013  Th 5:15-6:15 PM 177
September 2013  Sa 10:15-11:15 MID 371


 

FIGURE 7

12-Hour Weekend Counts

Figure 7 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data.

FIGURE 8

Weekday Peak Hour Volumes

Figure 8 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.


 

 

FIGURE 9

Weekend Peak Hour Volumes

Figure 9 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

 

 

A.4      ARLINGTON: MINUTEMAN TRAIL AND SWAN PLACE

TABLE 4

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
May 2011  Sa 10:45-11:45 MID 314
May 2011  Tu 5:45-6:45 PM 167
July 2011  Tu 6:00-7:00 PM 243
July 2012  Sa 11:00-12:00 MID 383
July 2012  Tu 7:30-8:30 AM 246
May 2013  Sa 9:45-10:45 AM 227
May 2013  Tu 5:30-6:30 PM 320
July 2013  Sa 3:15-4:15 PM 358
July 2013  Tu 6:00-7:00 PM 294
September 2013  Sa 9:45-10:45 MID 351

 

FIGURE 10

12-Hour Weekday Counts

Figure 10 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data


 

FIGURE 11

Weekday Peak Hour Volumes

Figure 11 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 12

Weekend Peak Hour Volumes

Figure 12 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

A.5      HUDSON: ASSABET RIVER TRAIL — RTE 85 CROSSING

TABLE 5

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
September 2007  Sa 11:15-12:15 MID 70
May 2008  Tu 6:15-7:15 PM 102
July 2008  Sa 11:45-12:45 MID 58
July 2008  Tu 12:30-1:30 MID 41
September 2008  Sa 1:30-2:30 MID 61
May 2009  Sa 2:15-3:15 MID 82
May 2009  W 4:15-5:15 PM 59
September 2009  Su 12:00-1:00 MID 107
May 2010  Sa 10:45-11:45 MID 154
May 2010  W 10:45-11:45 MID 66
September 2010  Sa 1:45-2:45 MID 66
July 2011  Sa 1:30-2:30 MID 115
July 2011  Tu 9:00-10:00 AM 46
July 2012  Sa 10:30-11:30 MID 80
July 2012  Tu 9:00-10:00 AM 49
September 2012  Sa 2:45-3:45 MID 114
July 2013  Sa 10:30-11:30 MID 48
July 2013  F 6:15-7:15 PM 33
September 2013  Sa 10:30-11:30 MID 107

 

FIGURE 13

Weekday Peak Hour Volumes

Figure 13 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 14

Weekend Peak Hour Volumes

Figure 14 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.


A.6      BOSTON: SOUTHWEST CORRIDOR TRAIL — 100 FT NORTH OF HEATH ST

TABLE 6

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
May 2005  Tu 8:30-9:30 AM 97
May 2009  W 8:45-9:45 AM 175
May 2010  Sa 1:00-2:00 MID 167
May 2010  Tu 9:00-10:00 AM 199
September 2010  Tu 6:15-7:15 PM 290
July 2012  Th 5:45-6:45 PM 264
July 2012  Sa 12:45-1:45 MID 108
September 2012  W 5:45-6:45 PM 373
September 2012  Th 5:45-6:45 PM 372
September 2012  Sa 1:45-2:45 MID 127
May 2013  W 5:45-6:45 PM 151
May 2013  Th 8:45-9:45 AM 129

 

FIGURE 15

Weekday Peak Hour Volumes

Figure 15 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.


 

 

FIGURE 16

Weekend Peak Hour Volumes

Figure 16 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

 

A.7      CAMBRIDGE: KENDALL SQUARE — BROADWAY/MAIN ST/3RD ST

TABLE 7

Peak Hour Volumes

Day, Month-Year Peak Hour Period Volume
Weds, May 1976 9:45-10:45 AM 65
Thurs, May 1981 5:15-6:15 PM 110
Tues, May 1987 9:00-10:00 AM 141
Weds, May 1992 9:15-10:15 AM 143
Sat, July 2013 1:00-2:00 MID 69

 

FIGURE 17

Peak Hour Bicycle Volumes

Figure 17 is a bar chart showing the peak hour bicycle volume from each count in the MPO’s database for this location.

 

 

 

A.8      SOUTHWICK: SOUTHWICK RAIL TRAIL CONGAMOND RD & RTE 168 CROSSING

TABLE 8

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
September 2009  Su 11:30-12:30 MID 55
May 2010  Sa 12:30-1:30 MID 86
May 2010  Tu 9:15-10:15 AM 11
July 2010  Sa 10:00-11:00 MID 79
July 2011  Sa 10:45-11:45 MID 135
September 2012  Tu 5:45-6:45 PM 82
September 2012  Th 6:15-7:15 PM 91
September 2012  Su 12:00-1:00 MID 227
May 2013  Tu 5:45-6:45 PM 106
May 2013  Th 4:45-5:45 PM 14
May 2013  Su 1:30-2:30 MID 188
September 2013  Sa 11:00-12:00 MID 141
September 2013  Tu 4:00-5:00 PM 34

 

FIGURE 18

12-Hour Counts

Figure 18 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data.


 

FIGURE 19

Weekday Peak Hour Volumes

Figure 19 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 20

Weekend Peak Hour Volumes

Figure 20 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.


A.9      SALISBURY: OLD EASTERN MARSH TRAIL AND FRIEDENFELS STREET

TABLE 9

Peak Hour Volumes

>
Month-Year Day Peak Hour Period Volume
May 2011  Sa 8:45-9:45 AM 51
May 2013  M 5:15-6:15 PM 40
May 2013  Tu 5:30-6:30 PM 61
May 2013  Sa 10:30-11:30 MID 56

 

FIGURE 21

12-Hour Counts

Figure 21 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data.

 


 

 

FIGURE 22

Weekday Peak Hour Volumes

Figure 22 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 23

Weekend Peak Hour Volumes

Figure 23 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

 

A.10    NEWBURYPORT: CLIPPER CITY RAIL TRAIL AT WASHINGTON STREET

TABLE 10

Peak Hour Volumes

Month-Year Day Peak Hour Period Volume
May 2010  Tu 11:45-12:45 MID 62
July 2013  Sa 10:15-11:15 MID 145
July 2013  Su 4:00-5:00 PM 159

 

FIGURE 24

12-Hour Counts

Figure 24 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data

 

 

 

FIGURE 25

Peak Hour Volumes

Figure 25 is a bar chart showing the peak hour bicycle-pedestrian volume from each count in the MPO’s database for this location.

 

 

 

 

 

A.11    BEDFORD: GREAT RD AT SOUTH RD; SHAWSHEEN RD AT PAGE RD; CONCORD RD AT MCMAHON RD

TABLE 11

Peak Hour Volumes

Location Month-Year Day Peak Hour Period Volume
 GREAT RD AT SOUTH RD September 2012  Tu 7:15-8:15 AM 17
 GREAT RD AT SOUTH RD May 2013  M 7:15-8:15 AM 16
 GREAT RD AT SOUTH RD May 2013  Tu 7:15-8:15 AM 25
 SHAWSHEEN RD AT PAGE RD September 2012  W 7:30-8:30 AM 18
 SHAWSHEEN RD AT PAGE RD May 2013  M 7:15-8:15 AM 6
 CONCORD RD AT MCMAHON RD September 2012  W 7:30-8:30 AM 31
 CONCORD RD AT MCMAHON RD May 2013  F 7:15-8:15 AM 15

 

FIGURE 26

Weekday Peak Hour Bicycle Volumes

 Figure 26 is a bar chart showing the peak hour bicycle volume from each weekday count in the MPO’s database for this location.

 


 

A.12    METHUEN: METHUEN RAIL TRAIL AT RAILROAD ST PARKING LOT

TABLE 12

Peak Hour Volumes

Date Day Peak Hour Period Volume
 07-MAY-2013  Tu 5:30-6:30 pm 17
 09-MAY-2013  Th 4:45-5:45 pm 8
 11-MAY-2013  Sa 2:00-3:00 mid 12

 

FIGURE 27

Weekday Peak Hour Volumes

Figure 27 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

 


 

FIGURE 28

Weekend Peak Hour Volumes

Figure 28 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.

 

 

 

 

A.13    NEEDHAM: KENDRICK ST AND HUNTINg RD

TABLE 13

Peak Hour Volumes

PLACEHOLDER TEXT FOR TABLE CAPTION
Date Day Peak Hour Period Volume
 07-JUL-2013  Su 9:45-10:45 AM 92
 04-JUL-2013  Th 1:45-2:45 MID 37
 05-JUL-2013  F 12:45-1:45 MID 16
 06-JUL-2013  Sa 12:45-1:45 MID 27
 11-AUG-2013  Su 9:00-10:00 AM 106
 12-SEP-2013  Th 4:00-5:00 PM 62

 

FIGURE 29

Weekday Peak Hour Bicycle Volumes

Figure 29 is a bar chart showing the peak hour bicycle volume from each weekday count in the MPO’s database for this location.

 


 

 

FIGURE 30

Weekend Peak Hour Bicycle Volumes

Figure 30 is a bar chart showing the peak hour bicycle volume from each weekend count in the MPO’s database for this location.

 

 

 

 

 

A.14    WESTFIELD/SOUTHWICK: COLUMBIA GREENWAY RAIL TRAIL AT SOUTHWICK BORDER

TABLE 14

Peak Hour Volumes

PLACEHOLDER TEXT FOR TABLE CAPTION
Date Day Peak Hour Period Volume
 11-MAY-2013  Sa 12:00-1:00 MID 28
 07-MAY-2013  Tu 5:30-6:30 PM 64
 09-MAY-2013  Th 5:00-6:00 PM 15

 

FIGURE 31

12-Hour Counts

Figure 31 is a graph of bicycle-pedestrian volumes over time of day according to 12-hour count data.

 


 

 

FIGURE 32

Weekday Peak Hour Volumes

Figure 32 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

FIGURE 33

Weekend Peak Hour Volumes

Figure 33 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekend count in the MPO’s database for this location.


 

A.15    AMESBURY: AMESBURY RIVERWALK/POWWOW WALK

TABLE 15

Peak Hour Volumes

PLACEHOLDER TEXT FOR TABLE CAPTION
Date Day Peak Hour Period Volume
 10-SEP-2013  Tu 4:15-5:15 PM 27

 

FIGURE 34

Weekday Peak Hour Volumes

Figure 34 is a bar chart showing the peak hour bicycle-pedestrian volume from each weekday count in the MPO’s database for this location.

 


 

A.16    Quincy: hancock st at Washington st; nepoNset bridge at quincy shore drive; Wollaston beach at 790 quincy shore drive

TABLE 16

Peak Hour Volumes

PLACEHOLDER TEXT FOR TABLE CAPTION
Location Month-Year Day Peak Hour Period Volume
 HANCOCK STREET AT WASHINGTON STREET September 2013  W 4:00-5:00 PM 17
 NEPONSET BRIDGE AT QUINCY SHORE DRIVE September 2013  W 8:00-9:00 AM 18
 WOLLASTON BEACH AT 790 QUINCY SHORE DRIVE September 2013  W 5:00-6:00 PM 16
 NEPONSET BRIDGE AT QUINCY SHORE DRIVE September 2013  Sa 12:00-1:00 MID 13

 

FIGURE 35

Peak Hour Bicycle Volumes

Figure 35 is a bar chart showing the peak hour bicycle volume from each count in the MPO’s database for this location.