Programming and Implementation of Strategies

Programming of Strategies

CMP strategies are implemented through the following methods:

The congested corridors listed in Tables 7-1 and 7-2 have previously been studied by CTPS staff. Tables 7-3 and 7-4 (below) show the recommended strategies, which are based on a sample of past studies that, when implemented, could help relieve congestion for these corridors. The checklist displays the seven possible types of strategies that could be considered for each corridor. An X indicates that a strategy has already been studied.

The corridors displayed in Tables 7-3 and 7-4 have not been previously analyzed by MPO staff. Therefore, a quick analysis was conducted to see which of the seven strategies might be suitable for relieving congestion within those corridors. This was a preliminary analysis, and the suitable strategies may be subject to change depending on corridor conditions.


Table 7-1

Congestion Management Strategies Previously Analyzed for Congested Corridors: Arterial Roadways

Corridor

Direction

From

To

TDM

Non-

motorized

Incident

Response*

ITS

Operations

Transit

Expansion

Alewife Brook Pkwy.

NB

Soldiers Field Rd.

on-ramp

Route 2

X

X

X

X

X

Alewife Brook Pkwy.

SB

Route 2

Soldiers Field Rd.     on-ramp

X

X

X

X

X

Route 107

NB

Route 16

Albert J. Brown Circle

X

X

X

X

Route 107

SB

Albert J. Brown

Circle

Route 16

X

X

X

X

Route 114

EB

Palmer Ave.

Marblehead TL

X

X

X

X

Route 114

WB

Marblehead TL

Palmer Ave.

X

X

X

X

Route 129

EB

Route 1A

Ocean Ave.

X

X

X

X

X

Route 129

WB

Ocean Ave.

Route 1A

X

X

X

X

X

Route 1A

NB

Bell Circle

Oak Island Rd.

X

X

X

X

Route 1A

SB

Oak Island Rd.

Bell Circle

X

X

X

X

Route 1A

SB

Rotary

1st Bell Circle signal

X

X

X

X

Route 28

NB

Highland Ave.

Assembly Sq. Mall

X

X

X

Route 28

SB

Assembly Sq. Mall

Highland Ave.

X

X

X

Route 3A

NB

Hingham  TL

I-93 Interchange

X

X

X

X

Route 3A

SB

I-93 Interchange

Hingham TL

X

X

X

X

Route 60

EB

Newton St.

Trapelo Rd.

X

X

X

Route 60

WB

Trapelo Rd.

Newton St.

X

X

X

Route 3/3A

NB

Country Club Rd.

Billerica TL

X

X

X

X

Route 3/3A

SB

Billerica TL

Country Club Rd.

X

X

X

X

 Route 138

NB

Park Ave.

I-93

X

X

 

X

X

 

X

 Route 138

SB

I-93

Park Ave.

X

X

 

X

X

 

X

 Route 4

NB

Route 2

Billerica TL

X

X

 

X

X

 

 

 Route 4

SB

Billerica TL

Route 2

X

X

 

X

X

 

 

 Route 109

EB

I-495

Birch St.

X

 

 

X

X

X

 

 Route 109

WB

Birch St.

I-495

X

 

 

X

X

X

 

       *Incident responses were not addressed for these corridors as of February 2012.


TABLE 7-2

Congestion Management Strategies Previously Analyzed for Congested Corridors:

Limited-Access Roadways and Expressway

Corridor

Direction

From

To

TDM

Non-

motorized

Incident

Response*

ITS

Operations

Transit

Expansion

I-90

EB

Market St. overpass

Center St.

X

X

X

X

I-90

WB

Center St.

Weston Border

X

X

X

X

X

I-93

SB

Braintree Split

Government Center

X

X

X

I-93

NB

I-95

Braintree Split

X

X

X

I-93

SB

Braintree Split

I-95

X

X

X

I-95

NB

Winter St.

Route 3

X

X

X

I-95 

NB

I-93

Route 30

X

X

I-95 

SB

Route 30

I-93

X

X

Route 2

NB

Newtown Rd.

I-95

X

X

X

X

Route 2

SB

I-95

Newtown Rd.

X

X

X

X

Route 24

NB

Mazzeo Dr.

I-93

X

X

Route 24

SB

I-93

Mazzeo Dr.

X

X

Route 3

SB

Braintree Split

Exit 14

X

X

X

X

Route 3

NB

Exit 14

Braintree Split

X

X

X

Route 9

EB

Southborough

Brookline Ave.

X

X

X

X

X

Route 9

WB

Brookline Ave.

Southborough

X

X

X

X

X

Route 1/VFW Pkwy

NB

I-95

Centre St.

X

X

X

X

X

X

Route 1/VFW Pkwy

SB

Centre St.

I-95

X

X

X

X

X

X

I-95

NB

I-95/I-93 Split

Dedham St. overpass

X

X

X

I-95

SB

Dedham St.

overpass

Braintree Split

X

X

X

         *Incident responses were not addressed for these corridors as of October 2012.


TABLE 7-3

Possible Solutions for Congested Corridors: Arterial Roadways

Corridor

Direction

From

To

TDM

Non-

motorized

Incident

Response

ITS

Operations

Transit

Expansion

Route 119

NB

Pope Rd.

Route 2

X

X

Route 119

SB

Route 2

Pope Rd.

X

X

Route 127

EB

Essex TL

Route 128

X

X

X

X

Route 127

WB

Route 128

Essex TL

X

X

X

X

Route 140

NB

Maple St.

Foxborough TL

X

X

X

X

Route 140

SB

Foxborough TL

Maple St.

X

X

X

X

Route 145

EB

Boston TL

Revere TL

X

X

X

X

X

Route 145

WB

Revere TL

Boston TL

X

X

X

X

X

Route 16

EB

Concord St.

Capital St.

X

X

X

X

Route 16

WB

Capital St.

Concord St.

X

X

X

X

Route 1A

NB

Kingman St.

 Market St.

X

X

X

Route 1A

SB

Lynnway stop sign

Kingman St.

X

X

X

Route 1A

NB

First signal

Hanson St.

X

X

X

X

Route 203

EB

Harvard St.

I-93

X

X

X

X

Route 203

WB

I-93

Harvard St.

X

X

X

X

Route 203/ Jamaicaway

EB

Willow Pond Rd.

Forest Hills Rotary

X

X

X

X

Route 203/ Jamaicaway

WB

Forest Hills Rotary

Willow Pond Rd.

X

X

X

X

Corridor

Direction

From

To

TDM

Non-

motorized

Incident

Response

ITS

Operations

Transit

Expansion

Route 27

NB

Depot St.

Canton St.

X

X

X

Route 27

SB

Canton St.

Depot St.

X

X

X

Route 28

NB

Presidents Dr.

Riverside Ave.

X

X

 

X

X

 

 

Route 28

SB

Riverside Ave.

Presidents Dr.

X

X

X

X

Route 28

NB

Third St.

Twin City Mall

X

X

X

X

Route 28

SB

Twin City Mall

Third St.

X

X

X

X

Route 30

EB

I-90

Route 9

X

X

X

X

Route 37

NB

Route 139

I-93

X

X

X

Route 37

SB

I-93

Route 139

X

X

X

Route 62

EB

Bedford-Concord TL

Burlington TL

X

X

Route 62

WB

Burlington TL

Bedford-Concord TL

X

X

Route 99

NB

Dexter St.

Shute St.

X

X

X

X

Route 99

SB

Shute St.

Dexter St.

X

X

X

X

Memorial Dr.

EB

Soldiers Field Rd.

Longfellow Bridge

X

X

X

Memorial Dr.

WB

Longfellow Bridge

Soldiers Field Rd. 

X

X

X

Mystic Valley

Pkwy.

EB

Auburn St.

Main St.

X

X

Mystic Valley

Pkwy.

WB

Main St.

Auburn St.

X

X

Storrow Dr.

EB

Memorial Dr.

Leverett Circle

X

X

Storrow Dr.

WB

Leverett Circle

Memorial Dr.

X

X


 

TABLE 7-4

Possible Solutions for Congested Corridors: Limited-Access Roadways and Expressways

Corridor

Direction

From

To

TDM

Non-

motorized*

Incident

Response*

ITS

Operations

Transit

Expansion

I-90

EB

Cambridge St. Overpass

Toll plaza

X

X

X

I-90

WB

Toll plaza

Exit 17 (Newton/Watertown)

X

X

X

I-93

NB

Leverett Circle

I-95

X

X

I-93

SB

I-95

Leverett Circle

X

X

I-93

NB

Government Center

Braintree Split

X

X

X

I-95

SB

Route 3

Winter St.

X

X

X

Route 1A/ Route 60

NB

Logan on-ramp

U-turn

X

X

Route 1A/ Route 60

SB

U-Turn

Logan on-ramp

X

X

Route 2

EB

Lake St.

Alewife signal

X

X

X

Route 2

WB

Alewife signal

Lake St.

X

X

X

Route 1

NB

City Square

Chelsea off-ramp

X

X

Route 1

SB

Chelsea off-ramp

City Square

X

X

Route 1

NB

I-93

Route 99 on-ramp

X

X

X

Route 1

SB

Lowell St.

I-93

X

X

X

Storrow Dr.

WB

Leverett Circle

Memorial Dr.

X

X

        *Nonmotorized responses and incident responses were not addressed for these corridors as of October 2012.


Strategy Implementation

Currently, the Boston Region MPO has no dedicated funding for the design and construction of recommendations that result from CMP-recommended studies funded through the UPWP. Instead, many elements of the CMP-defined UPWP studies have been implemented or progressed to design and construction by implementing agencies that have that authority. Typically, recommendations are of the management and operations type for arterial corridors, intersections, and freeway bottlenecks, many of them multimodal according to MassDOT’s highway design manual, including principles of “complete streets” and livability. Short-term recommendations are often implemented through municipal or agency maintenance funds. Long-term recommendations are considered by implementing agencies for design and construction according to their priorities and in combination with other considerations.

 A good way to promote the implementation of CMP recommendations is to “educate” the stakeholders, the decision makers, and members of the public about this process. The basis of the implementation of the Boston Region MPO’s Congestion Management Process is the newly-formed CMP Committee in which stakeholders and staff have begun to collaborate and critique each other’s recommendations about what solutions are best for the region. Once a consensus is reached, it will be easier to advocate for these projects to decision makers in the MPO and across the region.

In 2012, the Boston Region MPO Congestion Management Committee was formed. It consists of the following MPO members: